My project is a creative interactive installation, which fits in the “Student is engaged in practice-based research, i.e. successive iterations of prototyping and refining, or making a video game, or movie, or anything that involves purely making” category. The good news is that there is no third party or any human-envolved primary research included, however, the project plan should more strictly foucued on my working habits as well as the semester mile stones. Since I am also co-op with Ziye Zhang as my teammate and tech support, it is also crucial to update all the plans with him to double check if he is flexible.
The most crucial phases making a installation is Brainstorming, Pre-Visualization, Materials, Fabrication and Testing, hence, I think it would be great to matcherate my previs phase with the First Prototype Due date. And since I am planning to buy all my materials and get them shipped before March, Demo Day can be me done making one of the fragments. I also need to immediately looking for spaces to storage the installation and all materials.
Project Phase 1
1/23-2/4
Project Phase 2
2**/5-2/18**
Project Phase 3
2/19-3/3